Skip to main content
1 · Pre-flight

Covers the whole time you have the aircraft out — confirmed once, not per leg.

HB-YXX is airworthy
  • Due soon ELT battery
    48 days left (until 30 Nov 2026)
  • Due soon Air filter
    9:00 left · hard limit in 29:00
  • OK Annual inspection
    28:30 left · hard limit in 38:30
    196 days left (until 28 May 2027)
  • OK ARC
    272 days left (until 16 Aug 2027)
  • OK Oil change
    32:00 left
  • OK Propeller overhaul
    520:00 left
    1290 days left (until 25 Apr 2030)

Open defects